Averill Field Park Phase 1 Improvements
The Averill Field Park Phase 1 Improvements project for the City of Snohomish required the complete reconstruction of the existing community playground into the city’s
The Averill Field Park Phase 1 Improvements project for the City of Snohomish required the complete reconstruction of the existing community playground into the city’s
The Faith Family Village Development required the construction infrastructure development to support 8 family shelters units and 2 restroom structures manufactured by the Pallet Shelter
The Pilchuck Park Roadway Relocation project involved the relocation and reconstruction of the park entrance roadway away from the failing riverbank of the adjacent Pilchuck
The Snohomish County Fairfield Park project involved reconstruction of the park entrance drive aisle aligning the entrance at the intersection of Fryelands Blvd and 156th
The Desimone-Briscoe School Levee Rehabilitation MATOC Project for the US Army Core of Engineers – Seattle district involved the excavation and reconstruction of the levee
The Whittaker Mixed Use project involved three categories of construction and construction management work which was: Site Development work, Street Improvement work and Utilities /
The Bell Street Park project involved the complete reconstruction of Bell Street from 1st Ave to 5th Ave in the Belltown neighborhood of Seattle just
The Lake Sammamish State Park Boat Launch Improvement project in-water work included the installation of three (3) new dock abutment structures with gangways and floating
The Lewis Creek Park project for the City of Bellevue involved the construction and development of a new community park located in the Lakemont neighborhood
Construction of a new section of the Lakemont boulevard trail including the installation of a timber framed elevated boardwalk structure above an existing wetland area
The North Creek Non-motorized Trail and Pedestrian Bridge project involved the construction of new concrete bridge abutments, design, onsite assembly, and crane pick installation of
This habitat enhancement project for the City of Mountlake Terrace was necessary to relocate Lyon Creek away from Cedar Way just north of the intersection
The Kayu Kayu Ac Park project for the City of Shoreline involved the construction and development of a new community park located in the Richmond
This project included the construction and management for the complete redevelopment of the GSTC Camp River Ranch facility located in Carnation, Washington. Key Project Elements: