Your strategic General Contracting & Construction Management Services Firm

Desimone-Briscoe School Levee Rehabilitation – US Army Core of Engineers

Construction Management

Baekjeong Korean BBQ Restaurant TI – Alderwood Mall

CPM Tenant Improvement Solutions – Snohomish, WA

The Baekjeong Korean BBQ Restaurant TI project was constructed at the former Macaroni Grill space at the Alderwood Mall in Lynnwood, WA. The project involved the complete reconstruction of the 7,000-sf restaurant space for the new Baekjeong KBBQ facility, their first location in the State of Washington. Our Client, CPM Tenant Improvement Solutions was the prime general contractor for this project, and we provided complete construction management services starting with project estimating & procurement, owner negotiation-value engineering continuing with the construction buildout and final project completion closeout.

Key Construction Management Service Elements:

  • Performed all project estimating and compiled all proposal submittal documents
  • Performed all project VE analysis
  • Final Owner Contract Negotiation and Execution Oversight
  • Coordination and Subcontracting Procurement
  • Daily Project Management Oversight
  • Baseline Project Schedule Implementation
  • Key Coordination with Project Stakeholders including the Alderwood Mall Management Staff throughout the Construction Duration
  • Complete Change Order Management
  • Procurement of Key Project Specialty Finishes
  • Photo Documentation
  • Assist with Final Project Permitting Closeout
  • Assist the Project Owner with the Landlord Tenant Allowance Documentation and Release

Key Work Scope Elements:

  • Complete Exterior and Interior TI Reconstruction / Renovation
  • Complex Exterior Building Envelope Modifications
  • Complex Design Build Fire Suppression System and Mall Fire Alarm System Integration
  • Handling and Installation of Owner Provided – Korean Mother of Pearl Decorative Panels
  • Design Build Meat Processing Walk-in Cooler Onsite to Avoid Excessive Long Lead Time Delays
  • Procurement and Installation of specialty wall “slim brick” material finishes
  • Coordination and implementation for the Owner provided “Houdini Hood Table Exhaust Fan System”
  • New HVAC Systems Complete utilizing “Duct Sock” ventilation distribution
  • New Captive Aire Kitchen Type 1 Hoods (4)
  • Reconditioning the large walk-in cooler including all new refrigeration equipment
  • All New Kitchen Equipment
  • Custom Fabricated Restroom Concrete Countertops
  • Custom Fabricated Bar with Granite Slab Countertops